This blog won't be updated now that our website has been redesigned.

Please visit it to check out all our great information, images, and links.


Click here to go to Island Pathways website.

Our Initiatives

Island Pathways spearheads:
1. building the Ganges Village Pathway Network;
2. publishing the Salt Spring Heritage Map with Bike Routes;
3. fitting 500+ island kids with bike helmets for cost;
4. installing bike racks, 36 on island so far;
5. lobbying to get a paved bikeway through Salt Spring;
6. hosting special events like Velo Village 2012;
7. holding other, smaller gatherings like an Easter Bicycle Parade, a cycling forum, yearly AGM speakers.

Saturday, 27 April 2013

GANGES HILL FEASIBILITY STUDY



The Capital Regional District Regional (CRD) Parks Department retained JE Anderson & Associates to complete a feasibility study regarding biking and walking on the Fulford Ganges Road hill south of Ganges on Salt Spring Island. The early goal of this feasibility review was to select two options and prepare Class D cost estimates (rough order-of-magnitude project cost) for both options. ... Based on draft cost estimate, sketches, and a site visit, an additional option was requested for inclusion in the feasibility study.

click on the table to see full size

The full 16-page report plus preliminary design plans were presented at the 2013 April 23 meeting of the Salt Spring Island Transportation Commission (SSITC). The report is available in the agenda package for the meeting, pages 2-14:
Get This 4 Column Template Here
Get More Templates Here